The following locations have been granted a Noise Bylaw Exemption:
| Date | Hours | Location | Activity |
|---|---|---|---|
| Jun 12 Until Resolved |
24/7 | 11431 Williams Road |
Sanitary Bypass |
| Jun 13 to Dec 15 |
7:00am to 8:00pm |
4311 Moncton Street (Weekend Schedule) |
Construction Works |
| Jun 17 Until Resolved |
24/7 | 11920 Dunavon Place | Sanitary Bypass |
| Jul 5 to Jul 7 |
6:00pm to 6:00am |
Westbound Lanes of Steveston Highway (No. 5 Road to Shell Road. Shell Road Intersection Included) |
Paving Works |
| Jul 5 to Jul 7 |
6:00pm to 6:00am |
10871 Steveston Highway | Paving Works |
| Jul 6 to Jul 17 |
8:00pm to 7:00am |
Westminster Highway (Between No. 2 Road and Gilbert Road Work scheduled from Monday to Friday) |
BC Hydro Works |
| Jul 7 to Jul 8 |
10:00pm to 8:00am |
Hollybridge Way and Lansdowne Road | Metro Vancouver Works |
| Jul 8 & Jul 9 |
12:00am to 7:00am |
South Approach of No. 2 Road Bridge (South Bound Lane) |
Asphalt Works |
| Jul 13 & Jul 14 |
12:00am to 7:00am |
South Approach of No. 2 Road Bridge (North Bound Lane) |
Asphalt Works |
| Jul 16 to Feb 29 |
7:00am to 12:00am |
Steveston Cannery Channel (Work to be Performed Monday to Friday, and Intermittent Weekends. Holidays are Excluded.) |
Maintenance Dredging |
For more information on exemptions to this Bylaw, contact:
Jaime Villaluz, Assistant Supervisor, Inspections
Email: Jaime.Villaluz@richmond.ca
Phone: 604-276-4014
Apply for a Noise Bylaw Exemption
Three weeks' notice is required
To apply for a Noise Bylaw Exemption, complete the following application. A minimum of three weeks' notice is required for this type of application to be processed.
Noise Bylaw Exemption Application
All applicants must review Noise Regulation Bylaw 8856.
Purpose of Noise Bylaw Exemption
The Noise Bylaw Exemption allows construction projects to proceed outside of normal working days/hours under certain circumstances. The Exemption may be granted to construction projects by the General Manager if the project satisfies the following conditions (refer to Bylaw 8856 Section 4.2.2):
- The volume of traffic in the area of the proposed construction is such as to cause danger to the workers on the job or to cause traffic congestion;
- The impact and inconvenience to residents in the area of the proposed construction can be minimized;
- The construction cannot be undertaken efficiently or safely during the normal working day; or
- Interruption of any during normal working day would cause any person undue hardship.