Construction Projects - Previous Years

2010 Paving Program

Please be aware that our paving program is weather dependent, typically beginning the spring and continuing until early fall each year.

Our paving (capping) program is largely based upon priorities identified by the pavement management system.  If you notice a road that you feel is in extremely poor condition, please contact our Roads Department at 604-340-1373 to report the condition.

2010 Paving Schedule
Residents directly fronting the roads listed will be notified by our contractor that paving is scheduled in their area.  Please ensure that vehicles are not parked or obstructing the road during paving.

Dates will be included as they become available:

Roads Paving Dates
8000 Block Williams Road  Deferred
9000 Block Williams Road Deferred
10000 Block Cambie Road Completed
6000 Block Francis Road Completed
8000 Block No. 5 Road (Kingsbridge Drive to Blundell Road) TBA
6000 Block Garden City Road (Granville Avenue to Westminster Highway) Completed
3000 Block Regent Street Deferred
Smith Crescent (Westminster Highway to Gilley Road) Deferred
11000 Block Steveston Highway Completed
Bridgeport Road (No. 5 Road to Sweden Way) Deferred
7000 Block Steveston Highway Deferred
9000 Block No. 2 Road Completed
Steveston Indoor Tennis Court (parking lot) Deferred
South Arm Community Centre (parking lot) Completed
10000 Block Williams Road (vibration complaints/limited scope) Completed
11000 Block Williams Road (vibration complaints/limited scope) Completed
11851 No. 5 Road (vibration complaints/limited scope) Deferred
5000 Block Francis Road (vibration complaints/limited scope) Deferred
Grauer Road (vibration complaints/limited scope) Completed
10871 Steveston Highway (westbound lanes only) Completed
Westminster Highway at No. 9 Road (overpass) Deferred
Vulcan Way (west of No. 6 Road) (CN Rail crossing) Deferred
No. 8 Road (south of River Road) (CN Rail Crossing) Deferred