Phase 2 Site ConstructionPhase 2 included formwork and concrete pouring, with the Oval superstructure rising up from the ground and the 'bones' of the Oval taking their shape.
The building was officially opened December 2008.
|
| ||
Phase 1 Site Construction
Phase 1 of site construction occurred between the fall of 2005 and summer of 2006. This Phase included site preparation and pre-loading, road re-alignment, pile driving and more.